Sysop Blogs

KG7AV Equipment Move - Temp Outages - Updated

KG7AV and KG7AV-10 have been running from a temporary setup following water damage that occurred to the shack some six weeks ago. Pleased to report that the construction crew has finished work on the shack, and equipment will be transitioning this week. Expect temporary outages for KG7AV-10 (packet) and KG7AV (winmor) gateways.

Updated - Everything moved and back on air as of 04Nov2014 0336 UTC.

UpDATE: VA7DGP BPQ32 Winlink Gateway

I've had some issues with a script file that kept crashing the system. I found the glitch and were back up and running. I have also added script that if system receives NTS message via Packet. The message is forwarded via HF to NTS Target Station on HF. We shall see whether it gets used.

Enjoy

Don va7dgp
New Westminster BC Winlink Gateway

LA3F Hybrid integration of 40m and 60m (secondary status)

As of sunday nov. 2. we succeeded in moving both 40m and 60m and make a new install of 60m now all on the same planned site using a separate PC.
The other ports hit by ligtning damage in the neighbourhood still need some more unspecified controll and repair delays.

Pages

Have our news pushed to your browser or RSS reader. Click the orange RSS feed icon.

Subscribe to RSS - blogs
Winlink Linkomatic