The rack's cooling fan failed, computers were reporting temperatures out of design operating limits. Equipment shut down until new fan available or a cooler operating environment.
Gateway is in development. Will be running 9 to 17:00 daily for testing until the IC-2300 is received and installed. Then 24/7. Now operational in Okaloosa and Walton Counties, Florida via Vara FM. 145.090