XE1CRG, located in Irapuato, Guanajuato, MX Grid DL90HQ is now available.
This completes the 3 year project to install 4 WinLink gateways in Mexico. XE2BNC XE1VP XE2EOS XE1CRG
7070.0 10142.0 14091.0 18107.0 Center Up to Pactor 4 and WinMor 1600
Here are a few photos showing the large commercial battery system and UPS for XE2EOS.
Also the ground and protection. Site is remote at 8000 foot mountain near Guatemalan border.
Thunderstorms abound in this area, site is between both coasts. Power going out is often, but returns
in a few hours. Battery system should last several days. Internet is occasionally a problem due to
the long haul Ubiquiti link to obtain it. Thanks to auto forwarding, traffic still moves to other Gateways
via their connection to a CMS.