Sysop Blogs

OFF-AIR WHILE UPGRADING

N1XP-X, multiple staitons off-air for upgrading.

Pikes Peak Cycling Hill Climb -- KD0SFY

Once again Pikes Peak ARES used Winlink in the Packet P2P mode at 9600 bd to support the Pikes Peak Cycling Hill Climb. Winlink was used to transfer 20 files from the 14,115 ft summit down to the awards/staging area at 9,400 ft. It is only a 12.5 mile drive (5.6 miles Line Of Sight), but has over 155 turns and takes about 30-40 minutes to drive the results down, plus there would be cyclists on the road. Same course as driven during the world famous Pikes Peak International Hill Climb, just on bicycles (and the occasional unicycle).

KG7MYX Maintenance

Station will be unavailable for a few days next week as we remodel/rewire things in the shack. KG7MYX

Pages

Have our news pushed to your browser or RSS reader. Click the orange RSS feed icon.

Subscribe to RSS - blogs
Winlink Linkomatic